| The
Second Prototype Project: For Today World's
Economic Electricity Plant |
| |
|
| |
| The
Second Prototype's Mechanism is base on Two Principle's Core |
| |
|
 |
1.
Principle of Hammer Shock Pressure is Proof. |
|
|
|
Gravity is the only Source
Energy, Potential Energy, to be use in this
experiment. In addition, massive waterpower
could turns turbine for producing electric
current. |
|
| |
|
 |
2.
Principle of Reservoir's Circulation, in Closed
System Water, is Proof. |
|
|
|
Water Pressure is piping
upward to turning Turbine above Reservoir
and then all of water falling down to the
Reservoir. This experiment is proof the concept
of Vertical Dam, producing electricity current,
which without out-source for this process. |
|
|
| |
|
|
| |
| Impact
Gravity Pump is consist of Three Mechanisms |
|
|
|
| 1. |
Superintendent
Mechanism:- Composing Mechanisms of |
| |
|
|
|
Energy
Source: |
|
Gravity is
the Potential Energy, influence to Mass of water,
causes Mass of Water in Static-Force Stage. |
|
|
|
Water-Intake
Process:
(Static to Dynamic Force) |
|
Mass of Water
(Static-Force Stage) is sent into the pump and changing
Potential Energy to Kinetic Energy or Hydrodynamic
(Dynamic- Force Stage). In addition, by Flow-Pressure-Water
use Volume of Water and this is carrying Energy
to work or create Hammer Shock. |
| |
|
Water,
in Reservoir, high 30 m.
To decrease diameter of water-intake pipe, from
60" to 12",
Is to increase significant
water pressure, sending into the Pump. |
| |
|
|
|
Input pipe |
60" reduce to
12" (pressure water to pump) |
|
|
Output pipe |
6" (pressure
water to turn Turbine) |
| |
|
|
|
| |
|
Specially Hammer Shock:
(by Impact Gravity Pump) |
|
A phenomenon management of Hydrodynamic, by sending
massive water pressure flows into the Air-Volume-Fixed
Capacity of Impact Gravity Pump, to replace air
volume and then suddenly air valve is closed. A
massive reaction of water pressure explode, causes
Water Power from Hammer Shock action directly to
accumulate force to compressed spring and trigger's
process to hydraulic inside, “Impact Gravity Pump".
A massive water pressure Causes, and then piping
to turn turbine for producing electricity current. |
|
|
|
Inner-Pressure
Control: |
|
Intake-water
valve is to be controlled. For accumulate force
stroke, Mechanical Process have to balance pressure
in the Fix-Volume Capacity of Impact Gravity Pump. |
|
|
|
2. |
Compression
Mechanism:- Composing Mechanisms of |
|
| |
|
|
Transmission
Energy: |
|
This Process,
Water Pressure, inside Fix-Volume Capacity, is
compressing by hydraulic piston. Cause of Hammer
Shock, and Volume of Water is could not decrease
its Volume by compressing, therefore Hydrodynamic
Pressure is effect. |
|
|
|
Compressing
Hydraulic:
|
|
Compressing
Hydraulic is moving, which Release-Atmosphere Pressure
package and Inside- compressed Spring, to pressure
water inside Fix-Volume pump and passing Air Chamber. |
| |
|
|
|
3. |
Retreat
Mechanism |
|
| |
|
|
Complex
Process: |
|
Multiple
of Compressed-Spring Mechanical as Potential Energy
accumulates, including hydraulic Principle and
Suction Force of Fluid. All of parts influence
to retreat Mechanism back to the First Stoke without
losing water to release suction pressure in the
pump, as Hydraulic Ram. |
| |
|
This Process
is function key and exactly recommend to "Vertical
Dam Theory", to maintain and circulate
Reservoir in The Closed Water System. |
|
|
| |
| |
| |
The
Second Prototype Project: To Create Innovation "Impact
Gravity Pump" |
| |
|
| |
Looking for Fund or Joint
Venture to support and share the project: |
| |
|
| |
| 1. |
Project
experiment Budget:
3 Million. |
| |
| - |
Equipment
: CNC Lathe 3 D & 5 axle, Furnace, Winch,
Tools etc. |
| - |
Workshop & Camp:
for 28 Workmen etc. |
| - |
Tower
Tank: 30 m. High , Turbine, Generator etc. |
| - |
Expense
Cost: During 18 Months etc. |
| |
|
|
| 2. |
Project Experiment Term:
18
Month |
| |
|
|
| |
 |
|
| |
| |
|
|